Final | 10/15/2007 | 10/16/2007 | 10/16/2007 | A | PASS |
Troy James
|
|
|
LKV Architects Phone #: ###-#### Internet Inspection Request from: Doramus Cassi
|
Final | 10/15/2007 | 10/15/2007 | 10/15/2007 | P | PASS |
Troy James
|
|
|
|
Rough-in | 10/5/2007 | 10/5/2007 | 10/5/2007 | P | PASS |
Troy James
|
|
|
Cover- LKV Architects Phone #: ###-#### Internet Inspection Request from: Doramus Cassi ok to cover ceiling
|
Rough-in | 8/28/2007 | 8/29/2007 | 8/29/2007 | A | PASS |
Dixie Fellows
|
|
|
LKV Phone #: ###-#### Internet Inspection Request from: Doramus Cassi..r/i ok
|
Rough-in | 8/27/2007 | 8/27/2007 | 8/27/2007 | P | NR |
Dixie Fellows
|
|
|
LKV - thx Phone #: ###-#### Internet Inspection Request from: Doramus Cassi...corrections not ready
|
Rough-in | 8/24/2007 | 8/24/2007 | 8/24/2007 | P | FAIL |
Dixie Fellows
|
|
|
need manuf specs and access door at s/f damper...remove flex conn at bath exhausts..exhaust air from communication room to outside
|
Rough-in | 8/23/2007 | 8/24/2007 | 8/24/2007 | A | NR |
Bill VanDegrift
|
|
|
lkv arch this is a pm inspection
|
Rough-in | 8/22/2007 | 8/23/2007 | 8/23/2007 | A | NR |
Alan Hauser
|
|
|
recall for friday, to look at areas that will be concealed
|