Final | 2/7/2008 | 2/7/2008 | 2/7/2008 | P | PASS |
Dixie Fellows
|
|
|
Phone #: ###-#### Internet Inspection Request from: April Sims
|
Final | 2/5/2008 | 2/6/2008 | 2/6/2008 | A | NR |
Dixie Fellows
|
|
|
Cooktop specs are in drawer, w/h specs are in ziplock baggie next pipes, and furnace specs should be on furnace Call with any problems. Thanks, April. Phone #: ###-#### Internet Inspection Request from: April Sims
|
Final | 2/4/2008 | 2/4/2008 | 2/4/2008 | P | FAIL |
Dixie Fellows
|
|
|
Phone #: ###-#### Internet Inspection Request from: April Sims...need manuf specs for w/h flues...need specs for clearance on flue at furnace..they built a chase right next to the termination..need specs in english for gas cook-top
|
Rough-in | 8/21/2007 | 8/21/2007 | 8/21/2007 | P | PASS |
Dixie Fellows
|
|
|
sealed r/a, attic furnace has overflow safety swich, secondary condensate not required Phone #: ###-#### Internet Inspection Request from: April Sims
|
Pressure Test | 8/20/2007 | 8/20/2007 | 8/20/2007 | P | PASS |
Dixie Fellows
|
|
|
Phone #: ###-#### Internet Inspection Request from: April Sims
|
Rough-in | 8/20/2007 | 8/20/2007 | 8/20/2007 | P | FAIL |
Dixie Fellows
|
|
|
Phone #: ###-#### Internet Inspection Request from: April Sims..seal r/a plenums..need secondary drain at attic furnace
|