Final | 12/4/2007 | 12/4/2007 | 12/4/2007 | A | PASS |
Lee Rice
|
|
|
Scheduled by a contractor via Hello! on 12/4/2007 at 12:05:21 AM. Contact: ###-####.
|
Pressure Test | 9/28/2007 | 9/28/2007 | 9/28/2007 | P | PASS |
Dixie Fellows
|
|
|
mark...20lb gas ok
|
Rough-in | 9/26/2007 | 9/28/2007 | 9/28/2007 | A | PASS |
Dixie Fellows
|
|
|
mark Phone #: ###-####
|
Rough-in | 8/29/2007 | 8/30/2007 | 8/30/2007 | P | PART |
Dixie Fellows
|
|
|
Mark; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt...ok to cover except around range vent and bath exhaust
|
Conference | 8/10/2007 | 8/13/2007 | 8/13/2007 | A | PASS |
Bill VanDegrift
|
|
|
Mark ###-#### combustion air and exhaust conference. class 0 duct ok for exhaust, 5" liner ok. combustion air fron two holes on the door of the mech room ok. self closinf gasketed door from mech room to bath room.
|