Final | 1/2/2008 | 1/3/2008 | 1/3/2008 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 1/2/2008 at 4:45:52 PM. Contact: ###-####.
|
Rough-in | 8/22/2007 | 8/22/2007 | 8/22/2007 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 8/22/2007 at 8:42:43 AM.
|
Rough-in | 8/20/2007 | 8/21/2007 | 8/21/2007 | P | NR |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 8/20/2007 at 1:43:30 PM. Contact: ###-####....contractor will reschedule
|
Pressure Test | 8/20/2007 | 8/21/2007 | 8/21/2007 | A | NR |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 8/20/2007 at 1:44:04 PM. Contact: ###-####.
|