Final | 12/28/2007 | 12/31/2007 | 12/31/2007 | A | PASS |
Alan Hauser
|
|
|
|
Rough-in | 11/7/2007 | 11/8/2007 | 11/8/2007 | A | PASS |
Alan Hauser
|
|
|
20#
|
Rough-in | 10/1/2007 | 10/2/2007 | 10/2/2007 | A | FAIL |
Bill VanDegrift
|
|
|
Phone #: ###-#### Internet Inspection Request from: April Sims see the other inspection request for corrections.
|
Pressure Test | 10/1/2007 | 10/2/2007 | 10/2/2007 | A | FAIL |
Bill VanDegrift
|
|
|
Phone #: ###-#### Internet Inspection Request from: April Sims 20# test ok needs an insulation shield at the b-vent, complete framing at the b-vent. install bath fans to the ducting. needs a fireplace permit and inspection after the framing is complete.
|
Pressure Test | 9/24/2007 | 9/24/2007 | 9/24/2007 | P | FAIL |
Alan Hauser
|
|
|
gauge is on 14#, retest and recall, no access to building
|