Final | 10/31/2007 | 11/1/2007 | 11/1/2007 | A | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 10/31/2007 at 12:06:00 PM. Contact: ###-####.
|
Final | 10/30/2007 | 10/31/2007 | 10/31/2007 | A | FAIL |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 10/30/2007 at 9:42:51 AM. Contact: ###-####. flex duct connection to be installed per manufacturer installations, fix flec duct connection to HP-1 from fresh air
|
Rough-in | 10/4/2007 | 10/5/2007 | 10/5/2007 | A | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 10/4/2007 at 10:44:40 AM. Contact: ###-####. check SD and fresh air at final
|