Final | 6/18/2008 | 6/18/2008 | 6/18/2008 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 6/18/2008 at 7:46:03 AM. Contact: ###-####.
|
Final | 6/16/2008 | 6/17/2008 | 6/17/2008 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 6/16/2008 at 2:37:41 PM. Contact: ###-####....posted c/n on furnace at 3221
|
Rough-in | 1/28/2008 | 1/29/2008 | 1/29/2008 | P | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 1/28/2008 at 4:40:40 PM. Contact: ###-####. ri and 2-20# tests ok
|
Rough-in | 1/28/2008 | 1/29/2008 | 1/28/2008 | P | CANC |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 1/28/2008 at 4:36:18 PM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Jan 28 2008 4:50PM.
|