Final | 10/30/2008 | 10/30/2008 | 10/30/2008 | P | PASS |
Lee Rice
|
|
|
Kevin is the contact, will be open Phone #: ###-#### Internet Inspection Request from: Sheri Lilya
|
Pressure Test | 7/10/2008 | 7/10/2008 | 7/10/2008 | P | PASS |
Alan Hauser
|
|
|
ok to cover
|
Pressure Test | 7/9/2008 | 7/9/2008 | 7/9/2008 | P | FAIL |
Alan Hauser
|
|
|
pipe under solid floor to be in sleeve, 2003 ifgc section404.6
|
Rough-in | 4/9/2008 | 4/10/2008 | 4/10/2008 | A | PASS |
Dixie Fellows
|
|
|
Please call kevin 1st, to meet you there, Thanks Dixie Phone #: ###-#### Internet Inspection Request from: Sheri Lilya..20lb gas ok...furn ok
|
Rough-in | 4/8/2008 | 4/8/2008 | 4/8/2008 | P | NR |
Dixie Fellows
|
|
|
Kevin is the contact Phone #: ###-#### Internet Inspection Request from: Sheri Lilya..call for conference
|