Final | 10/3/2008 | 10/3/2008 | 10/3/2008 | P | PASS |
Dixie Fellows
|
|
|
ethan---ductwork only
|
Rough-in | 10/2/2008 | 10/3/2008 | 10/3/2008 | A | PASS |
Dixie Fellows
|
|
|
ethan Phone #: ###-####
|
Rough-in | 9/29/2008 | 9/29/2008 | 9/29/2008 | P | FAIL |
Dixie Fellows
|
|
|
ethan Phone #: ###-####...need class 1 duct...dryer vent not done yet
|
Conference | 8/18/2008 | 8/18/2008 | 8/18/2008 | P | DONE |
Troy James
|
|
|
Ethan Phone #: ###-####
|