Final | 4/30/2008 | 4/30/2008 | 4/30/2008 | P | PASS |
Troy James
|
|
|
Please call Darren if you have any questions. Re-check gas piping for mechanical final. Phone #: ###-#### Internet Inspection Request from: Brian Donahue
|
Rough-in | 4/25/2008 | 4/28/2008 | 4/28/2008 | A | FAIL |
Troy James
|
|
|
Floor was drying last friday....no access ceiling ok to cover, left c/n for gas regulators, sediment traps/test port before regulator shall be positioned facing down
|
Rough-in | 4/25/2008 | 4/25/2008 | 4/25/2008 | P | CANC |
Lee Rice
|
|
|
The is for an above cieling rough-in. Please call Matt if you have any questions. Phone #: ###-#### Internet Inspection Request from: Brian Donahue.....rescheduled for troy for Monday due to floor drying
|
Pressure Test | 3/27/2008 | 3/28/2008 | 3/28/2008 | A | PASS |
Troy James
|
|
|
Please call Jim Barry when you get to the site! Thank you! Phone #: ###-#### Internet Inspection Request from: Brian Donahue 60# for two meters
|
Pressure Test | 3/26/2008 | 3/27/2008 | 3/27/2008 | A | FAIL |
Troy James
|
|
|
Please call Darren if you have any questions! Phone #: ###-#### Internet Inspection Request from: Brian Donahue 3/4" gas pipe to rtu's is undersized, see plans for correct sizing
|