Final | 6/4/2008 | 6/5/2008 | 6/5/2008 | A | PASS |
Dixie Fellows
|
|
|
final - luke Phone #: ###-#### Internet Inspection Request from: Brandon Sorensen
|
Final | 6/2/2008 | 6/3/2008 | 6/3/2008 | A | FAIL |
Dixie Fellows
|
|
|
final - luke Phone #: ###-#### Internet Inspection Request from: Brandon Sorensen...pipe secondary drain to approved location...need primary drain locations...protect conduits from a/c to disconnect box as they are laying in the dirt..thanks dixie
|
Rough-in | 4/14/2008 | 4/15/2008 | 4/15/2008 | P | PASS |
Dixie Fellows
|
|
|
rough-in: luke Phone #: ###-#### Internet Inspection Request from: Brandon Sorensen
|
Rough-in | 4/9/2008 | 4/9/2008 | 4/9/2008 | P | NR |
Dixie Fellows
|
|
|
rough-in / cover Phone #: ###-#### Internet Inspection Request from: Brandon Sorensen....complete exhausts and flues
|