Final | 6/18/2008 | 6/19/2008 | 6/19/2008 | P | PASS |
Troy James
|
|
|
We need a partial final inspection on this. We just need the grid inspected as late on Thursday as possible. Building will be open. Thank you. Phone #: ###-#### Internet Inspection Request from: Wade Huskey
|
Rough-in | 4/30/2008 | 5/1/2008 | 5/1/2008 | P | PASS |
Troy James
|
|
|
Phone #: ###-#### Internet Inspection Request from: Wade Huskey
|
Rough-in | 4/25/2008 | 4/28/2008 | 4/28/2008 | A | FAIL |
Troy James
|
|
|
Phone #: ###-#### Internet Inspection Request from: Wade Huskey c/n posted
|
Pressure Test | 4/25/2008 | 4/28/2008 | 4/28/2008 | A | PASS |
Troy James
|
|
|
Phone #: ###-#### Internet Inspection Request from: Wade Huskey two tests at 60#
|