Final | 7/22/2009 | 7/22/2009 | 7/22/2009 | A | PASS |
Troy James
|
|
|
unit 602 is not complete for final, need permit pulled for unit 602 is ready for final inspection
|
MEC-Aging Inspection | 7/8/2009 | 7/8/2009 | 7/8/2009 | | PEND |
Dixie Fellows
|
|
|
is this ready for a fina?
|
MEC-Aging Inspection | 5/4/2009 | 5/4/2009 | 5/4/2009 | | PASS |
Dixie Fellows
|
|
|
wip
|
Final | 3/3/2009 | 3/4/2009 | 3/4/2009 | A | PART |
Alan Hauser
|
|
|
need finish gas piping and final inspection by troy james
|
Final | 2/25/2009 | 2/26/2009 | 2/26/2009 | A | FAIL |
Troy James
|
|
|
Rocky Mitchell is the field contact. needs an inspection on 7th floor cooridor. Phone #: ###-#### Internet Inspection Request from: Heidi Mallet corridor ceiling is covered, unable to inspect, will check corridor at final inspection of floor
|
Final | 2/19/2009 | 2/20/2009 | 2/20/2009 | A | PART |
Troy James
|
|
|
Rocky Mitchell is the field contact. We need a final inspection on Level 5. Phone #: ###-#### Internet Inspection Request from: Heidi Mallet 4th and 5th floor ok
|
Final | 2/5/2009 | 2/6/2009 | 2/6/2009 | A | PART |
Troy James
|
|
|
Rocky Mitchell is the field contact. Needs Temp Occupancy and a final inspection for all the public areas. Phone #: ###-#### Internet Inspection Request from: Heidi Mallet ok to occupy unit 508 only
|
Final | 1/28/2009 | 1/29/2009 | 1/29/2009 | A | FAIL |
Troy James
|
|
|
Rocky M is the field contact. Needs a final inspection on L5 & L2. Phone #: ###-#### Internet Inspection Request from: Heidi Mallet cabinet adjacent to range are not 18" from counter top, 5th and 6th floor at this time have failed
|
Final | 1/21/2009 | 1/22/2009 | 1/22/2009 | A | PART |
Troy James
|
|
|
Rocky Mitchell is the field contact. We need a final inspection on Level 5. Phone #: ###-#### Internet Inspection Request from: Heidi Mallet ok final on 6th floor for dry and wet mechanical
|
Pressure Test | 1/13/2009 | 1/14/2009 | 1/14/2009 | A | PASS |
Troy James
|
|
|
GAs Regulators installed. Need mech inspection done. Brent P is the field contact. Phone #: ###-#### Internet Inspection Request from: Heidi Mallet gas regulators ok all floors
|
Rough-in | 12/29/2008 | 12/30/2008 | 12/30/2008 | A | PASS |
Troy James
|
|
|
Rocky Mitchell is the field contact. Needs rough in inspection on 7th floor Phone #: ###-#### Internet Inspection Request from: Heidi Mallet
|
Pressure Test | 12/23/2008 | 12/24/2008 | 12/24/2008 | P | PASS |
Troy James
|
|
|
Brent Proper is the field contact. He needs a gas & hydronic inspection on Level 7. Phone #: ###-#### Internet Inspection Request from: Heidi Mallet
|
Rough-in | 12/23/2008 | 12/23/2008 | 12/23/2008 | P | PASS |
Troy James
|
|
|
Rocky Mitchell is the field contact. Needs a rough in on 3rd floor. Phone #: ###-#### Internet Inspection Request from: Heidi Mallet
|
Pressure Test | 12/9/2008 | 12/10/2008 | 12/10/2008 | P | PASS |
Troy James
|
|
|
Brent Proper is the field contact. Needs gas/hydronic inspection for level 4. Phone #: ###-#### Internet Inspection Request from: Heidi Mallet
|
Rough-in | 12/9/2008 | 12/10/2008 | 12/10/2008 | A | PASS |
Troy James
|
|
|
Rocky Mitchell is the field contact. Needs a fireplace flue inspection on Level 7. Phone #: ###-#### Internet Inspection Request from: Heidi Mallet
|
Pressure Test | 12/8/2008 | 12/9/2008 | 12/9/2008 | A | PASS |
Troy James
|
|
|
Brent Proper is the field contact. Needs a gas inspection on Level 7. Phone #: ###-#### Internet Inspection Request from: Heidi Mallet
|
Rough-in | 12/9/2008 | 12/9/2008 | 12/9/2008 | A | FAIL |
Troy James
|
|
|
Brent Proper is the field contact. Needs a gas inspection on Level 7. Phone #: ###-#### Internet Inspection Request from: Heidi Mallet fireplace flues have not been inspected, contractor to remove sheetrock to inspect flues and schedule reinspection
|
Pressure Test | 12/8/2008 | 12/8/2008 | 12/8/2008 | P | PASS |
Troy James
|
|
|
brent Proper needs a gas and Hydronic inspection on Level 3. RockY ###-#### needs a rough in inspection on Level 4. Phone #: ###-#### Internet Inspection Request from: Heidi Mallet
|
Rough-in | 12/8/2008 | 12/8/2008 | 12/8/2008 | P | PASS |
Troy James
|
|
|
brent Proper needs a gas and Hydronic inspection on Level 3. RockY ###-#### needs a rough in inspection on Level 4. Phone #: ###-#### Internet Inspection Request from: Heidi Mallet
|
Rough-in | 11/26/2008 | 11/26/2008 | 11/26/2008 | P | PASS |
Troy James
|
|
|
Brent Proper needs a hydronic/gas inspection on L3 & L5. Rocky Mitchell ###-#### needs a rough in on L5 and pre-rock on L7. Phone #: ###-#### Internet Inspection Request from: Heidi Mallet 5th floor only for hydronics and gas
|
Rough-in | 11/19/2008 | 11/20/2008 | 11/20/2008 | A | PASS |
Troy James
|
|
|
Rocky Mitchell is the field contact. Needs a rough in on the 6th floor. Phone #: ###-#### Internet Inspection Request from: Heidi Mallet
|
Pressure Test | 11/19/2008 | 11/20/2008 | 11/20/2008 | A | PASS |
Troy James
|
|
|
Brent Proper is the field contact. Needs a gas inspection on level 6 Hallway Main. Phone #: ###-#### Internet Inspection Request from: Heidi Mallet
|
Rough-in | 10/31/2008 | 11/3/2008 | 11/3/2008 | A | PART |
Troy James
|
|
|
Rocky Mitchell is the field contact. Needs a fire damper inspection on Level 1. Phone #: ###-#### Internet Inspection Request from: Heidi Mallet ok to cover fsd at main floor shaft, still need info from manufacturer stating how to extend fsd sleeve through wall
|
Pressure Test | 10/22/2008 | 10/22/2008 | 10/22/2008 | P | PASS |
Troy James
|
|
|
Jeff Rice is the field contact. He needs a Gas inspection on Level 7 East Side. Phone #: ###-#### Internet Inspection Request from: Heidi Mallet
|
Pressure Test | 10/16/2008 | 10/17/2008 | 10/17/2008 | P | FAIL |
Troy James
|
|
|
Brent Proper is the field contact. Needs gas inspection on Level 7 Phone #: ###-#### Internet Inspection Request from: Heidi Mallet 7th floor not complete
|
Pressure Test | 10/9/2008 | 10/10/2008 | 10/10/2008 | P | PASS |
Troy James
|
|
|
Brent Proper is the field contact. Needs a gas inspection on Level 6. Phone #: ###-#### Internet Inspection Request from: Heidi Mallet
|
Pressure Test | 9/29/2008 | 9/30/2008 | 9/30/2008 | P | PASS |
Troy James
|
|
|
Brent Proper is the field contact. He needs a gas inspection on level 1. Phone #: ###-#### Internet Inspection Request from: Heidi Mallet stack from meter to 7th floor, 60# test
|
Conference | 9/29/2008 | 9/30/2008 | 9/30/2008 | A | DONE |
Troy James
|
|
|
Rocky Mitchell is the field contact. Need a confrence for 9am. Phone #: ###-#### Internet Inspection Request from: Heidi Mallet
|
Pressure Test | 9/26/2008 | 9/29/2008 | 9/29/2008 | A | PASS |
Troy James
|
|
|
Brent Proper is the field contact. Needs a gas inspection on level 5. Phone #: ###-#### Internet Inspection Request from: Heidi Mallet
|
Rough-in | 9/29/2008 | 9/29/2008 | 9/29/2008 | A | PASS |
Troy James
|
|
|
Brent Proper is the field contact. Needs a gas inspection on level 5. Phone #: ###-#### Internet Inspection Request from: Heidi Mallet ok to cover ducts in lobby, still need fsd installation instructions
|
Rough-in | 9/17/2008 | 9/18/2008 | 9/18/2008 | A | FAIL |
Troy James
|
|
|
Rocky Mitchell is the field contact. He needs an inspection on the duct chase off the fluid cooler on floors 6 and 7. Phone #: ###-#### Internet Inspection Request from: Heidi Mallet ok to cover shaft at 6th and 7th floors south side of building fsd required at all penetrations of shaft, and need to install fsd per manufacturer installations for wood construction
|
Pressure Test | 9/3/2008 | 9/3/2008 | 9/3/2008 | P | PASS |
Troy James
|
|
|
Brent Proper is the field contact. Needs a gas inspection level 4. Phone #: ###-#### Internet Inspection Request from: Heidi Mallet ok 20# test to gas piping rooms only 4th floor
|
Pressure Test | 8/13/2008 | 8/14/2008 | 8/14/2008 | A | PASS |
Troy James
|
|
|
Brent Proper is the field contact. Needs a gas inspection on level 3. Phone #: ###-#### Internet Inspection Request from: Heidi Mallet gas piping 3rd floor to units only, 20#
|
Rough-in | 7/31/2008 | 8/1/2008 | 8/1/2008 | A | PART |
Alan Hauser
|
|
|
c2,c3,c4, level 2 ok, will need access for dryer booster fan on final, no gas piping done at this time
|
MEC-Aging Inspection | 7/8/2008 | 7/8/2008 | 7/8/2008 | | CANC |
Troy James
|
|
|
|
Conference | 4/28/2008 | 4/29/2008 | 4/29/2008 | A | PASS |
Dixie Fellows
|
|
|
Ben Livingston is the field contact. Conference meeting @ 9am. Phone #: ###-#### Internet Inspection Request from: Heidi Mallet...met with dave h and rocky and ben to discuss dryer vents, cook-top clearances, etc
|