Final | 10/23/2008 | 10/23/2008 | 10/23/2008 | P | PASS |
Dixie Fellows
|
|
|
ken Phone #: ###-####
|
Pressure Test | 10/7/2008 | 10/8/2008 | 10/8/2008 | A | PASS |
Bill VanDegrift
|
|
|
meet dixie to check hydronic piping snow melt system ok
|
Pressure Test | 10/7/2008 | 10/8/2008 | 10/8/2008 | A | PART |
Dixie Fellows
|
|
|
meet bill to check hydronic piping---100lb test on hydronics ok
|
Pressure Test | 10/6/2008 | 10/7/2008 | 10/7/2008 | P | PEND |
Dixie Fellows
|
|
|
kenneth Note: please call 1/2 hr prior to inspection Phone #: ###-####---need to let test set over night
|
Rough-in | 5/20/2008 | 5/20/2008 | 5/20/2008 | P | PASS |
Dixie Fellows
|
|
|
ken Phone #: ###-####
|
Pressure Test | 5/9/2008 | 5/9/2008 | 5/9/2008 | P | PASS |
Lee Rice
|
|
|
ken Phone #: ###-####
20 pound test.
|
Pressure Test | 5/8/2008 | 5/8/2008 | 5/8/2008 | P | FAIL |
Dixie Fellows
|
|
|
ken Phone #: ###-####....wrong guage
|