Final | 8/7/2008 | 8/7/2008 | 8/7/2008 | P | PASS |
Bill VanDegrift
|
|
|
final Phone #: ###-#### Internet Inspection Request from: Brandon Sorensen final ok
|
Rough-in | 7/28/2008 | 7/29/2008 | 7/29/2008 | A | PART |
Alan Hauser
|
|
|
areas with grid ok to cover
|
Rough-in | 7/17/2008 | 7/21/2008 | 7/21/2008 | A | PART |
Bill VanDegrift
|
|
|
finish first floor cover inspection for grid Phone #: ###-#### Internet Inspection Request from: Dave Tully enrtyway ok to cover.
|
Rough-in | 7/17/2008 | 7/18/2008 | 7/18/2008 | P | PART |
Bill VanDegrift
|
|
|
Partial ceiling grid inspection first floor Phone #: ###-#### Internet Inspection Request from: Dave Tully west and south west room ready for ceiling.
|
Rough-in | 7/10/2008 | 7/11/2008 | 7/11/2008 | P | PART |
Alan Hauser
|
|
|
hard ceiling areas ok for cover
|
Rough-in | 6/23/2008 | 6/24/2008 | 6/24/2008 | A | FAIL |
Alan Hauser
|
|
|
no materials that do not meet 25 flame/50 smoke rating to be used in plenum
|