Final | 8/21/2008 | 8/21/2008 | 8/21/2008 | P | PASS |
Dixie Fellows
|
|
|
michelle Phone #: ###-####
|
Rough-in | 7/21/2008 | 7/21/2008 | 7/21/2008 | P | PASS |
Troy James
|
|
|
karen Phone #: ###-####
|
Conference | 7/17/2008 | 7/17/2008 | 7/18/2008 | A | PASS |
Bill VanDegrift
|
|
|
please do a fixture count and give the info to Rita 3- range vents--3-dryers---3-bath---3-flue replacements.
|
Rough-in | 7/18/2008 | 7/18/2008 | 7/18/2008 | A | FAIL |
Bill VanDegrift
|
|
|
please do a fixture count and give the info to Rita ----- framing at the b-vent in the west unit has been removed and clearance to the b-vent is insufficient-- reframe--- provide clearances and call for reinspection.
|
Final | 6/30/2008 | 7/1/2008 | 7/1/2008 | A | PASS |
Bill VanDegrift
|
|
|
michaelle Phone #: ###-#### ri ok
|
Final | 6/26/2008 | 6/27/2008 | 6/27/2008 | P | FAIL |
Troy James
|
|
|
Michelle Phone #: ###-#### need approved dryer ducting to exterior
|
Final | 6/24/2008 | 6/25/2008 | 6/25/2008 | A | FAIL |
Bill VanDegrift
|
|
|
Dave Phone #: ###-#### complete framing around b-vent west unit. provide required clearances to b-vents in basement. exhaust fans incomplete.
|