Final | 9/18/2008 | 9/19/2008 | 9/19/2008 | A | PASS |
Troy James
|
|
|
Phone #: ###-#### Internet Inspection Request from: Karl Hestekin
|
Final | 9/11/2008 | 9/12/2008 | 9/12/2008 | P | PART |
Dixie Fellows
|
|
|
Phone #: ###-#### Internet Inspection Request from: Karl Hestekin...need troy to check roof-tops and air balance
|
Rough-in | 8/7/2008 | 8/8/2008 | 8/8/2008 | P | PASS |
Troy James
|
|
|
ok to cover grease duct first layer
|
Rough-in | 8/7/2008 | 8/7/2008 | 8/7/2008 | A | FAIL |
Troy James
|
|
|
welded grease duct inspection before fire wrap is installed Phone #: ###-#### Internet Inspection Request from: Karl Hestekin hole in grease duct and need slope back to hood
|
Rough-in | 7/10/2008 | 7/11/2008 | 7/11/2008 | A | PART |
Alan Hauser
|
|
|
bathroom and class room ok for cover
|