Final | 9/4/2008 | 9/4/2008 | 9/4/2008 | P | PASS |
Troy James
|
|
|
|
Pressure Test | 8/4/2008 | 8/5/2008 | 8/5/2008 | A | PASS |
Troy James
|
|
|
Phone #: ###-#### Internet Inspection Request from: JASON MEANS 60# test, change existing gas system to 2lb. new coffee roaster requires 800,000 btu
|
Pressure Test | 7/11/2008 | 7/14/2008 | 7/14/2008 | A | PASS |
Troy James
|
|
|
Phone #: ###-#### Internet Inspection Request from: JASON MEANS
|