Final | 10/15/2008 | 10/16/2008 | 10/16/2008 | A | PASS |
Alan Hauser
|
|
|
|
Rough-in | 7/15/2008 | 7/16/2008 | 7/16/2008 | P | PASS |
Alan Hauser
|
|
|
20#
|
Rough-in | 7/14/2008 | 7/14/2008 | 7/14/2008 | P | FAIL |
Alan Hauser
|
|
|
flue in attic to be all b-vent, no single wall pipe
|
Pressure Test | 7/14/2008 | 7/14/2008 | 7/14/2008 | P | PASS |
Alan Hauser
|
|
|
20#
|