Final | 10/14/2009 | 10/14/2009 | 10/14/2009 | A | PASS |
Dixie Fellows
|
|
|
john is the contact...ductwork only
|
Conference | 10/13/2009 | 10/14/2009 | 10/14/2009 | A | PASS |
Dixie Fellows
|
|
|
call john to check on job progress
|
Conference | 5/5/2009 | 5/5/2009 | 5/5/2009 | P | PEND |
Dixie Fellows
|
|
|
call john for info..called john ###-#### and left message to find out progress of job
|
Rough-in | 8/22/2008 | 8/22/2008 | 8/22/2008 | P | PASS |
Dixie Fellows
|
|
|
john ###-####...bath exhaust, under floor ducts and range vent ok
|
Final | 8/22/2008 | 8/22/2008 | 8/22/2008 | P | NR |
Dixie Fellows
|
|
|
john Phone #: ###-####...i rescheduled this for a r/i
|
Rough-in | 8/20/2008 | 8/20/2008 | 8/20/2008 | P | NR |
Dixie Fellows
|
|
|
John- please call 30 min prior to going Phone #: ###-####---discussed bath exhaust
|