Final | 10/31/2008 | 11/3/2008 | 11/3/2008 | A | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 10/31/2008 at 3:03:39 PM. Contact: ###-####.
|
Final | 9/15/2008 | 9/16/2008 | 9/16/2008 | A | CANC |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 9/15/2008 at 4:31:36 PM. Contact: ###-####. not ready, scheduled wrong house
|
Rough-in | 7/31/2008 | 7/31/2008 | 7/31/2008 | P | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 7/31/2008 at 9:30:46 AM. Contact: ###-####. 20#
|
Rough-in | 7/29/2008 | 7/29/2008 | 7/29/2008 | P | FAIL |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 7/29/2008 at 9:32:05 AM. Contact: ###-####. need required clearance to f/p flue to combustibles
|
Rough-in | 7/24/2008 | 7/24/2008 | 7/24/2008 | P | FAIL |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 7/24/2008 at 7:54:46 AM. Contact: ###-####. need framing completed at flue to verify proper clearances
|
Rough-in | 7/21/2008 | 7/22/2008 | 7/22/2008 | P | FAIL |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 7/21/2008 at 4:28:53 PM. Contact: ###-####. fire place flue is backgraded, complete framng around fire place flue on the 2nd floor.
|