Final | 10/10/2008 | 10/13/2008 | 10/13/2008 | A | PASS |
Dixie Fellows
|
|
|
oleg Phone #: ###-####
|
Rough-in | 8/12/2008 | 8/12/2008 | 8/12/2008 | P | PASS |
Troy James
|
|
|
OLEG Phone #: ###-#### 20# test
|
Rough-in | 8/8/2008 | 8/11/2008 | 8/11/2008 | P | FAIL |
Bill VanDegrift
|
|
|
Oleg Phone #: ###-#### vapor barrier required on supply fittings in the ceiling. gas test failed.
|