Final | 3/12/2009 | 3/12/2009 | 3/12/2009 | P | PASS |
Alan Hauser
|
|
|
|
Final | 2/24/2009 | 2/25/2009 | 2/25/2009 | A | PART |
Alan Hauser
|
|
|
|
Final | 1/26/2009 | 1/26/2009 | 1/26/2009 | P | PART |
Alan Hauser
|
|
|
temporary occ. for new addition ok, will be more work in old building later
|
Rough-in | 1/20/2009 | 1/20/2009 | 1/20/2009 | P | PART |
Alan Hauser
|
|
|
center main area ok for tile
|
Rough-in | 1/13/2009 | 1/13/2009 | 1/13/2009 | P | PART |
Alan Hauser
|
|
|
entrance and ne corner grid ok for cover
|
Rough-in | 1/9/2009 | 1/9/2009 | 1/9/2009 | P | PART |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 1/9/2009 at 9:35:33 AM. Contact: ###-####. ok to install ceiling at exhuast fan IT storage room existing portion of building. Still need to inspect connection to roof
|
Rough-in | 1/5/2009 | 1/6/2009 | 1/6/2009 | A | PART |
Alan Hauser
|
|
|
bathrooms and janitor closet room ok for ceilings
|
Rough-in | 12/30/2008 | 12/31/2008 | 12/31/2008 | A | PART |
Dixie Fellows
|
|
|
Job Contact Steve Tow ###-#### Call one half hour ahead. Phone #: ###-#### x189 Internet Inspection Request from: Steve Tow--OK TO COVER BATHROOMS NORTH SIDE
|
Rough-in | 12/23/2008 | 12/24/2008 | 12/24/2008 | A | PART |
Alan Hauser
|
|
|
can not have pvc piping in return air plenum, doesn't meet flame/smoke rating
|
MEC-Aging Inspection | 11/10/2008 | 11/10/2008 | 11/13/2008 | | PASS |
Alan Hauser
|
|
|
|
Rough-in | 9/8/2008 | 9/9/2008 | 9/9/2008 | A | PART |
Alan Hauser
|
|
|
diffuser relocation in old building ok
|