Final | 11/18/2008 | 11/18/2008 | 11/18/2008 | P | PASS |
Alan Hauser
|
|
|
|
Rough-in | 11/3/2008 | 11/3/2008 | 11/3/2008 | P | PASS |
Alan Hauser
|
|
|
ok to wrap grease duct
|
Rough-in | 10/28/2008 | 10/28/2008 | 10/28/2008 | P | PART |
Dixie Fellows
|
|
|
Please call John Hall ###-####. Thank you. Internet Inspection Request from: Dick Baldrica----grease duct welds ok thru 2nd floor
|
Conference | 9/23/2008 | 9/23/2008 | 9/23/2008 | P | DONE |
Troy James
|
|
|
PLEASE CALL 30 MINUTES BEFORE. THANKS DICK Phone #: ###-#### x111 Internet Inspection Request from: Dick Baldrica contractor is going to use captive air O clearance hood at top and back and side discharge between walls on roof
|