Final | 11/23/2009 | 11/23/2009 | 11/23/2009 | P | PASS |
Dixie Fellows
|
|
|
April ###-####
|
Final | 11/18/2009 | 11/19/2009 | 11/20/2009 | P | NR |
Dixie Fellows
|
|
|
bbq is ready Phone #: ###-#### Internet Inspection Request from: April Sims...notes are in permit for bbq
|
Final | 10/15/2009 | 10/15/2009 | 10/15/2009 | A | PART |
Dixie Fellows
|
|
|
ok for home-owners to move in..we will take care of the bbq, and boiler issues when lee is back on Monday.
|
Final | 10/13/2009 | 10/14/2009 | 10/14/2009 | P | FAIL |
Dixie Fellows
|
|
|
Phone #: ###-#### Internet Inspection Request from: April Sims..need comb air to furnace..boiler and gas line not installed yet..no flex allowed for comb air..need stamp and signature on plans for pool room..
|
Conference | 10/13/2009 | 10/14/2009 | 10/14/2009 | A | PEND |
Dixie Fellows
|
|
|
have they decided what to do about the bbq
|
Final | 10/12/2009 | 10/12/2009 | 10/12/2009 | P | FAIL |
Dixie Fellows
|
|
|
Phone #: ###-#### Internet Inspection Request from: April ..please have joel call me to discuss c/n...thanks
|
Pressure Test | 11/25/2008 | 11/26/2008 | 11/26/2008 | P | PASS |
Dixie Fellows
|
|
|
Phone #: ###-#### Internet Inspection Request from: April Sims
|
Rough-in | 11/25/2008 | 11/26/2008 | 11/26/2008 | P | PASS |
Dixie Fellows
|
|
|
Phone #: ###-#### Internet Inspection Request from: April Sims
|
Rough-in | 11/25/2008 | 11/26/2008 | 11/25/2008 | A | CANC |
Dixie Fellows
|
|
|
Phone #: ###-#### Internet Inspection Request from: April Sims Inspection cancelled from web by: April Sims
|
Pressure Test | 11/25/2008 | 11/26/2008 | 11/25/2008 | A | CANC |
Dixie Fellows
|
|
|
Phone #: ###-#### Internet Inspection Request from: April Sims Inspection cancelled from web by: April Sims
|
Rough-in | 11/24/2008 | 11/24/2008 | 11/25/2008 | P | PEND |
Dixie Fellows
|
|
|
Phone #: ###-#### Internet Inspection Request from: April Sims---bbq and pool specs
|
Pressure Test | 11/24/2008 | 11/24/2008 | 11/25/2008 | P | FAIL |
Dixie Fellows
|
|
|
Phone #: ###-#### Internet Inspection Request from: April Sims---leak
|
Rough-in | 11/14/2008 | 11/14/2008 | 11/14/2008 | P | FAIL |
Dixie Fellows
|
|
|
###-#### april---provide access to (catwalk) to all blowers, need disconnect and comb air at 2nd floor furnace, need specs on all equipment for clearances at terminations, wrap all 90% flues with armaflex, need back-draft dampers on cigar exhausts, need specs for bbq seal r/a to theatre room, furn in wine cellar needs 1/4" per foot grade, need comb air for furn in wine cellar, verify length of flue per manuf, need 1/4" per foot grade on all 90% furn(wine cellar), need pool heater specs for venting, verify size on lower comb air for pool heater and screw penetrating inner liner on b-vent(winer cellar)
|
Conference | 11/12/2008 | 11/14/2008 | 11/14/2008 | A | PEND |
Dixie Fellows
|
|
|
With Joel at 9:00. Thanks! Internet Inspection Request from: April Sims---met with joe...i will sent c/n list to you this pm....thanks dixie
|
Pressure Test | 11/11/2008 | 11/12/2008 | 11/12/2008 | A | PEND |
Dixie Fellows
|
|
|
Phone #: ###-#### Internet Inspection Request from: April Sims
|
Rough-in | 11/11/2008 | 11/12/2008 | 11/12/2008 | A | NR |
Dixie Fellows
|
|
|
Phone #: ###-#### Internet Inspection Request from: April Sims---need installer to meet me at job..thanks
|