Final | 11/10/2009 | 11/10/2009 | 11/10/2009 | A | PASS |
Dixie Fellows
|
|
|
doug ###-####....f/p only
|
Final | 10/13/2009 | 10/13/2009 | 10/13/2009 | P | NR |
Dixie Fellows
|
|
|
Please let me know if you have any problems. Thank you Doug ###-#### Phone #: ###-#### Internet Inspection Request from: Doug worden...waiting for A-1 to realign flues in chase...don't cover with shroud until inspected..thanks
|
Rough-in | 11/20/2008 | 11/20/2008 | 11/20/2008 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 11/20/2008 at 9:18:27 AM. Contact: ###-####.
|
Conference | 11/3/2008 | 11/3/2008 | 11/3/2008 | A | PASS |
Dixie Fellows
|
|
|
meet doug at 11:30----outside air to terminate outside----raise all flues
|
Rough-in | 10/29/2008 | 10/29/2008 | 10/29/2008 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 10/29/2008 at 8:19:50 AM. Contact: ###-####.....called and left message to schedule a conference---no return call
|
Rough-in | 10/14/2008 | 10/14/2008 | 10/14/2008 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 10/14/2008 at 5:15:46 AM. Contact: ###-####....doug, please recall for a conference
|