Final | 6/29/2009 | 6/30/2009 | 6/30/2009 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 6/29/2009 at 2:21:13 PM. Contact: ###-####.
|
Final | 6/3/2009 | 6/4/2009 | 6/4/2009 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 6/3/2009 at 9:44:28 AM. Contact: ###-####...need 24"clearance from exhaust to comb..waiting on letter from engineer approving a high temp wrap
|
Final | 5/7/2009 | 5/7/2009 | 5/7/2009 | A | NR |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 5/7/2009 at 7:01:23 AM. Contact: ###-####...need clarification from engineer regarding insulation on exhaust off generator..not to operate exhaust until resolved..
|
Conference | 4/21/2009 | 4/21/2009 | 4/21/2009 | A | DONE |
Eric Strole
|
|
|
training with dixie
|
Rough-in | 4/21/2009 | 4/21/2009 | 4/21/2009 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 4/21/2009 at 6:23:52 AM. Contact: ###-####.
|
MEC-Aging Inspection | 3/16/2009 | 3/16/2009 | 3/16/2009 | | PASS |
Dixie Fellows
|
|
|
wip
|
MEC-Aging Inspection | 1/14/2009 | 1/14/2009 | 1/14/2009 | | PASS |
Dixie Fellows
|
|
|
wip// all permits still active
|