Final | 7/14/2009 | 7/14/2009 | 7/14/2009 | A | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 7/14/2009 at 7:12:12 AM. Contact: ###-####.
|
Rough-in | 3/16/2009 | 3/17/2009 | 3/17/2009 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 3/16/2009 at 9:33:05 PM. Contact: ###-####.
|
Rough-in | 3/16/2009 | 3/16/2009 | 3/16/2009 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 3/16/2009 at 10:45:10 AM. Contact: ###-####.--wall not firred out far enough for dryer vent
|
Rough-in | 3/13/2009 | 3/13/2009 | 3/13/2009 | P | FAIL |
Dixie Fellows
|
|
|
Roger Phone #: ###-####---need to fir out wall at dryer vent
|