Final | 7/6/2009 | 7/7/2009 | 7/7/2009 | A | PASS |
Troy James
|
|
|
Rocky Mitchell is the field contact. Phone #: ###-#### Internet Inspection Request from: Heidi Mallet
|
Rough-in | 5/22/2009 | 5/22/2009 | 5/22/2009 | P | PASS |
Troy James
|
|
|
Rocky Mitchell is the field contact. We will need a Rough in and Gas Pressure Test. Phone #: ###-#### Internet Inspection Request from: Heidi Mallet
|