Final | 11/2/2009 | 11/3/2009 | 11/3/2009 | P | PASS |
Dixie Fellows
|
|
|
bj ###-####. call brandon at ###-#### for access Internet Inspection Request from: william kerwin
|
Final | 10/23/2009 | 10/23/2009 | 10/23/2009 | P | NR |
Dixie Fellows
|
|
|
BJ ###-#### CALL BRANDON 20 MINUTES BEFORE TO GET ACCESS .###-#### THANK YOU HAVE A GOOD WEEKEND! Internet Inspection Request from: william kerwin..condensate? mantle on f/p n/r
|
Rough-in | 6/10/2009 | 6/11/2009 | 6/11/2009 | P | PASS |
Dixie Fellows
|
|
|
brandon Phone #: ###-####...fp ok
|
Rough-in | 6/10/2009 | 6/10/2009 | 6/10/2009 | P | FAIL |
Dixie Fellows
|
|
|
bj...need clearance at back of f/p from insulation
|
Pressure Test | 6/10/2009 | 6/10/2009 | 6/10/2009 | P | PASS |
Dixie Fellows
|
|
|
brandon - please call 1/2 prior for access Phone #: ###-####...20lb gas to f/p ok
|
Rough-in | 5/29/2009 | 5/29/2009 | 5/29/2009 | A | PASS |
Dixie Fellows
|
|
|
call bj
|
Pressure Test | 5/28/2009 | 5/28/2009 | 5/29/2009 | P | PASS |
Dixie Fellows
|
|
|
BJ and rough in inspection please Phone #: ###-####..20lb gas ok
|
Rough-in | 5/27/2009 | 5/27/2009 | 5/27/2009 | A | FAIL |
Dixie Fellows
|
|
|
BJ ###-#### Internet Inspection Request from: william kerwin..doors locked
|
Pressure Test | 5/27/2009 | 5/27/2009 | 5/27/2009 | A | FAIL |
Dixie Fellows
|
|
|
BJ ###-#### Internet Inspection Request from: william kerwin..no access
|