Final | 12/1/2009 | 12/1/2009 | 12/1/2009 | P | PASS |
Alan Hauser
|
|
|
|
MEC-Aging Inspection | 11/25/2009 | 11/25/2009 | 11/25/2009 | | PASS |
Dixie Fellows
|
|
|
wip
|
Rough-in | 9/25/2009 | 9/25/2009 | 9/25/2009 | P | PASS |
Alan Hauser
|
|
|
20#
|
Rough-in | 9/23/2009 | 9/23/2009 | 9/23/2009 | P | PART |
Alan Hauser
|
|
|
duct ok, need to find out from architect about sizing of gasline, if it really needs to be 2 1/2"
|
Rough-in | 8/21/2009 | 8/21/2009 | 8/21/2009 | P | PART |
Alan Hauser
|
|
|
60# test on underground gas piping, piping goes along foundation then into crawlspace, this is all that is tested
|
Pressure Test | 8/20/2009 | 8/20/2009 | 8/20/2009 | P | FAIL |
Alan Hauser
|
|
|
gasline underslab will have to be in a sleeve or stay out side of foundation and then through crawlspace
|