Final | 11/4/2009 | 11/5/2009 | 11/5/2009 | A | PASS |
Troy James
|
|
|
|
Final | 11/4/2009 | 11/5/2009 | 11/5/2009 | A | PASS |
Troy James
|
|
|
john Phone #: ###-####
|
Final | 11/2/2009 | 11/3/2009 | 11/3/2009 | A | FAIL |
Troy James
|
|
|
dave Phone #: ###-#### gas piping has not been completed 3rd inspection, reinspection fee applied
|
Pressure Test | 10/30/2009 | 11/2/2009 | 11/2/2009 | A | PASS |
Troy James
|
|
|
John Phone #: ###-####
|