Final | 3/17/2010 | 3/17/2010 | 3/17/2010 | P | PASS |
Dixie Fellows
|
|
|
Ollie-late afternoon please Phone #: ###-####...ALAN HAUSER APPROVED THE RI AND FINAL ON THE WATER HEATER
|
MEC-Aging Inspection | 2/26/2010 | 2/26/2010 | 2/26/2010 | | PASS |
Dixie Fellows
|
|
|
wip
|
Rough-in | 12/24/2009 | 12/24/2009 | 12/24/2009 | P | PASS |
Alan Hauser
|
|
|
|
Pressure Test | 12/24/2009 | 12/24/2009 | 12/24/2009 | P | PASS |
Alan Hauser
|
|
|
20#
|
Rough-in | 12/18/2009 | 12/18/2009 | 12/18/2009 | P | FAIL |
Dixie Fellows
|
|
|
oleg Phone #: ###-####..w/h to be 2' above any vertical wall within 8'
|
Rough-in | 12/16/2009 | 12/16/2009 | 12/16/2009 | P | FAIL |
Dixie Fellows
|
|
|
Ollie Phone #: ###-####..this was a conference
|
Pressure Test | 12/11/2009 | 12/11/2009 | 12/11/2009 | P | FAIL |
Dixie Fellows
|
|
|
Oleg-pressure test and rough in inspection please Phone #: 412-491.NEED TO RUN GAS LINE TO F/P...NEED COMB AIR TO FURN AND W/H...W/H FLUE HORIZ EXCEEDS 75% OF THE VERICAL..NEED TO RUN PRIMARY AND SECONDARY DRAINS AT UPSTAIRS FURNACE
|