Final | 4/5/2010 | 4/5/2010 | 4/5/2010 | P | PASS |
Dixie Fellows
|
|
|
bryan Phone #: ###-####
|
Rough-in | 2/18/2010 | 2/19/2010 | 2/19/2010 | A | PASS |
Dixie Fellows
|
|
|
jason Phone #: ###-####
|
Pressure Test | 2/16/2010 | 2/17/2010 | 2/17/2010 | P | FAIL |
Dixie Fellows
|
|
|
Jason-Pressure test and rough in please Phone #: ###-####..gas failed (bad guage)..need shield at b-vent in attic..need 1" clearance from b-vent to roof..flue termination on roof needs another 2" of pipe
|