Final | 4/20/2010 | 4/20/2010 | 4/20/2010 | P | PASS |
Dixie Fellows
|
|
|
Call Willie with any questions. Thank you! Inspection requested from web by: Rhonda Marcum Phone #: ###-####
|
Rough-in | 3/30/2010 | 3/31/2010 | 3/31/2010 | A | PASS |
Dixie Fellows
|
|
|
9:00 meet contractor...100lb test for hydronics to 2nd leibert ok
|
Rough-in | 3/30/2010 | 3/30/2010 | 3/30/2010 | P | NH |
Dixie Fellows
|
|
|
mechanical pressure check, call Donny with any questions. Inspection requested from web by: Rhonda Marcum Phone #: ###-####..donny had to leave before i could get to the job..rescheduled for wed am
|
Rough-in | 3/22/2010 | 3/22/2010 | 3/22/2010 | P | PART |
Dixie Fellows
|
|
|
piping inspection Inspection requested from web by: Rhonda Marcum Phone #: ###-####...100LB HYDRONIC TO UNIT A--OK
|