Final | 6/24/2010 | 6/25/2010 | 6/25/2010 | A | PASS |
Dixie Fellows
|
|
|
peter Phone #: ###-####
|
Final | 6/15/2010 | 6/15/2010 | 6/15/2010 | P | NR |
Dixie Fellows
|
|
|
roy - late afternoon - please call 1/2 hr prior Phone #: ###-####...complete f/p..run 90' off w/h drain pan...re-wrap all cooper with insulation
|
Rough-in | 4/9/2010 | 4/12/2010 | 4/12/2010 | A | PASS |
Dixie Fellows
|
|
|
specs will be on site..call tony y when done
|
Rough-in | 4/9/2010 | 4/9/2010 | 4/9/2010 | A | PART |
Dixie Fellows
|
|
|
Troy ###-#### call 30 mins prior...gas ok...r/i not ready
|
Rough-in | 4/8/2010 | 4/8/2010 | 4/8/2010 | P | FAIL |
Dixie Fellows
|
|
|
roy Phone #: ###-####..one 60' off-set allowed in b-vent...###-####
|