Final | 5/24/2010 | 5/25/2010 | 5/25/2010 | A | PASS |
Dixie Fellows
|
|
|
final inspection needed on two gas see thru fireplaces. Dave Hurds ###-#### installer Inspection requested from web by: David Hurds Phone #: ###-####
|
Rough-in | 5/5/2010 | 5/5/2010 | 5/5/2010 | P | PASS |
Troy James
|
|
|
received pictures from english heritage for two fireplaces installed and covered without permit, i asked for pictures for insulation shield, insulation shield is good rough inspection approved
|
Rough-in | 5/4/2010 | 5/5/2010 | 5/5/2010 | A | FAIL |
Troy James
|
|
|
dave Phone #: ###-#### clearances okay at ceiling and roof penetration and at firebox, still need insulation shield and contractor will email pictures of insulation shield installed, will aprroved rough inspection once pictures are viewed
|