Final | 6/29/2010 | 6/30/2010 | 7/1/2010 | P | PASS |
Alan Hauser
|
|
|
|
Final | 6/22/2010 | 6/29/2010 | 6/29/2010 | A | NR |
Alan Hauser
|
|
|
will need guard rail along west side of roof, to extend 30" beyound rtu, each end. to be 42" in heighth and spacing no more than 21"
|
Rough-in | 6/21/2010 | 6/22/2010 | 6/22/2010 | A | PART |
Alan Hauser
|
|
|
duct and combustion air ok, recall when grid is in, but before tile
|
Rough-in | 6/18/2010 | 6/21/2010 | 6/21/2010 | P | FAIL |
Alan Hauser
|
|
|
need combustion air for water heater and make up air for exhaust fan in water heater room
|