Final | 11/2/2010 | 11/4/2010 | 11/4/2010 | P | PASS |
Alan Hauser
|
|
|
|
Rough-in | 9/23/2010 | 9/27/2010 | 9/27/2010 | A | PASS |
Alan Hauser
|
|
|
all upstairs ok for cover
|
Rough-in | 7/8/2010 | 7/8/2010 | 7/9/2010 | P | PASS |
Alan Hauser
|
|
|
|
Rough-in | 7/2/2010 | 7/6/2010 | 7/6/2010 | A | FAIL |
Alan Hauser
|
|
|
Chad ###-#### lap flue pipe with air flow
|
Conference | 6/22/2010 | 6/23/2010 | 6/23/2010 | A | PASS |
Alan Hauser
|
|
|
WENT over requirements for running the new flue for wh and furnace
|
Pressure Test | 6/22/2010 | 6/22/2010 | 6/22/2010 | P | PASS |
Alan Hauser
|
|
|
60# test whole system
|