Final | 9/7/2010 | 9/7/2010 | 9/7/2010 | P | PASS |
Dixie Fellows
|
|
|
Please call builder Ben 30 Min. before going out to job site ###-#### thank you Doug. Phone #: ###-#### >> Inspection requested via web by Doug Anderson
|
Rough-in | 7/14/2010 | 7/14/2010 | 7/14/2010 | P | PASS |
Dixie Fellows
|
|
|
Phone #: ###-#### >> Inspection requested via web by Doug Anderson
|
Rough-in | 7/12/2010 | 7/13/2010 | 7/13/2010 | A | FAIL |
Dixie Fellows
|
|
|
Phone #: ###-#### >> Inspection requested via web by Doug Anderson..metal strip not installed per manufacturer
|
Rough-in | 7/8/2010 | 7/9/2010 | 7/9/2010 | A | FAIL |
Troy James
|
|
|
Inspection requested from web by: Doug Anderson Phone #: ###-#### need safety strip and roofing material removed from flue
|
Conference | 6/29/2010 | 6/30/2010 | 6/30/2010 | A | FAIL |
Dixie Fellows
|
|
|
rough in Inspection requested from web by: Doug Anderson...need manuf specs on site
|