Final | 9/13/2010 | 9/13/2010 | 9/13/2010 | P | PASS |
Dixie Fellows
|
|
|
bob...signed the card
|
Final | 9/10/2010 | 9/13/2010 | 9/13/2010 | A | NR |
Dixie Fellows
|
|
|
Please call Bob with any questions. The card was not signed as finaled on Friday. Thank you Phone #: ###-#### >> Inspection requested via web by Rhonda Marcum...working on kitchen exhaust and w/h flue
|
Final | 9/7/2010 | 9/7/2010 | 9/7/2010 | P | NR |
Dixie Fellows
|
|
|
thank you Phone #: ###-#### >> Inspection requested via web by Rhonda Marcum...james didn't call to tell me when they were ready
|
Final | 9/7/2010 | 9/7/2010 | 9/7/2010 | A | NR |
Dixie Fellows
|
|
|
bob..still need 1/4" drop back to furn on exhaust...w/h not vented yet
|
Final | 9/2/2010 | 9/3/2010 | 9/3/2010 | A | PART |
Dixie Fellows
|
|
|
Please call Bob Campbell with any questions. Phone #: ###-#### >> Inspection requested via web by Rhonda Marcum...ok to cover ceiling except in rated area in basement...the G/C will have to ask the structural inspector how he wants the dryer vent and w/h vent protected at the ceiling in the basement.
|
Rough-in | 8/13/2010 | 8/16/2010 | 8/16/2010 | A | PASS |
Troy James
|
|
|
Call Bob Campbell with any questions Phone #: ###-#### >> Inspection requested via web by Rhonda Marcum ok to cover first floor ducts rough inspection
|
Rough-in | 7/27/2010 | 7/28/2010 | 7/28/2010 | A | PART |
Dixie Fellows
|
|
|
We need a R/I - Conference, Please call Bob Campbell for questions. Thank you Phone #: ###-#### >> Inspection requested via web by Rhonda Marcum...ok for cover...discussed u/g duct and how to fix it
|
Conference | 7/27/2010 | 7/28/2010 | 7/28/2010 | A | DONE |
Troy James
|
|
|
MEET DIXIE AT 9:30 existing underground duct
|