Final | 10/26/2010 | 10/26/2010 | 10/26/2010 | P | PASS |
Dixie Fellows
|
|
|
Ollie Phone #: ###-####
|
Final | 10/21/2010 | 10/22/2010 | 10/22/2010 | A | FAIL |
Dixie Fellows
|
|
|
Ollie Phone #: ###-####...need air for regulators
|
Pressure Test | 8/11/2010 | 8/12/2010 | 8/12/2010 | A | PASS |
Dixie Fellows
|
|
|
Oleg ###-####...60lb gas ok
|
Pressure Test | 8/10/2010 | 8/11/2010 | 8/11/2010 | A | FAIL |
Dixie Fellows
|
|
|
Ollie Phone #: ###-####....gas fail...leak
|
Rough-in | 8/9/2010 | 8/10/2010 | 8/10/2010 | A | PART |
Dixie Fellows
|
|
|
oleg - first thing in the morning if possible please Phone #: ###-####...r/i ok..gas failed..leak
|
Conference | 8/5/2010 | 8/6/2010 | 8/6/2010 | A | PEND |
Dixie Fellows
|
|
|
10:00 meet bill to check w/h specs for basement...need specs for z-vent
|
Rough-in | 8/5/2010 | 8/5/2010 | 8/5/2010 | P | FAIL |
Dixie Fellows
|
|
|
oleg Phone #: ###-####...both f/p are ok..both furn ok..gas ok..need manuf specs on w/h in basement by 10:00 fri am
|
Rough-in | 8/3/2010 | 8/3/2010 | 8/3/2010 | P | NR |
Dixie Fellows
|
|
|
Ollie-Rough in and pressure test please Phone #: ###-####..install w/h's
|
Conference | 7/28/2010 | 7/28/2010 | 7/28/2010 | P | PEND |
Dixie Fellows
|
|
|
Ollie-Please call at least 30 mins prior to inspection Phone #: ###-####..need to know how much working space is needed in front of tankless w/h per manuf
|