Final | 11/2/2010 | 11/3/2010 | 11/3/2010 | P | PASS |
Dixie Fellows
|
|
|
clay ###-####
|
MEC-Aging Inspection | 11/2/2010 | 11/2/2010 | 11/2/2010 | | PASS |
Dixie Fellows
|
|
|
will check on job
|
Pressure Test | 9/1/2010 | 9/1/2010 | 9/1/2010 | P | PASS |
Dixie Fellows
|
|
|
clay ###-####..20lb gas ok
|
Pressure Test | 8/31/2010 | 9/1/2010 | 9/1/2010 | A | NH |
Dixie Fellows
|
|
|
clay Phone #: ###-####...rescheduled for pm
|