Final | 10/5/2010 | 10/5/2010 | 10/5/2010 | P | PASS |
Dixie Fellows
|
|
|
meter re-location only
|
Pressure Test | 10/4/2010 | 10/5/2010 | 10/5/2010 | A | PASS |
Dixie Fellows
|
|
|
Jeff Phone #: ###-####...20lb test for meter re-locate ok
|
Pressure Test | 9/29/2010 | 9/30/2010 | 9/30/2010 | A | FAIL |
Bill VanDegrift
|
|
|
Jeff Phone #: ###-#### needs factory coated piping underground
|