Final | 10/25/2010 | 10/26/2010 | 10/26/2010 | A | PASS |
Dixie Fellows
|
|
|
>> Inspection requested via web by Stephanie Brown
|
Final | 10/21/2010 | 10/21/2010 | 10/21/2010 | P | CANC |
Dixie Fellows
|
|
|
>> Inspection requested via web by Stephanie Brown Inspection cancelled from web by: Stephanie Brown
|
Pressure Test | 9/22/2010 | 9/23/2010 | 9/23/2010 | A | PASS |
Dixie Fellows
|
|
|
>> Inspection requested via web by Stephanie Brown
|
Pressure Test | 9/21/2010 | 9/21/2010 | 9/21/2010 | P | FAIL |
Dixie Fellows
|
|
|
Please do this as late as possible. We are sending someone out right away but the builder wants the inspection today so that he doesnt loose a day. Contact our office please ###-#### >> Inspection requested via web by Stephanie Brown...bad guage...change and re-test
|
Pressure Test | 9/21/2010 | 9/21/2010 | 9/21/2010 | A | FAIL |
Alan Hauser
|
|
|
i was called by structural inspector on this job and he noticed that the pressure test had failed, but i had passed the r/i. i might have messed up on this, but the pressure test had failed and guage was on zero. sorry about this mix up. alan
|
Rough-in | 9/16/2010 | 9/17/2010 | 9/17/2010 | P | PASS |
Alan Hauser
|
|
|
20#
|