Final | 8/4/2011 | 8/4/2011 | 8/4/2011 | P | PASS |
Troy James
|
|
|
|
Mec-Aging Inspection | 7/13/2011 | 7/13/2011 | 7/15/2011 | | PASS |
Dixie Fellows
|
|
|
WIP
|
MEC-Aging Inspection | 4/13/2011 | 4/13/2011 | 4/15/2011 | | PASS |
Dixie Fellows
|
|
|
wip
|
Pressure Test | 2/10/2011 | 2/11/2011 | 2/11/2011 | A | PASS |
Dixie Fellows
|
|
|
terry ###-####...2---1"hydronic mains for 1st floor going up to the mechanical room ok at 100lb test each
|
Pressure Test | 2/9/2011 | 2/10/2011 | 2/10/2011 | P | PEND |
Dixie Fellows
|
|
|
If questions please call Terry @ ###-#### Phone #: ###-#### x0000 >> Inspection requested via web by Sonja Hankel...rescheduled with terry as he was already gone for the day
|
Pressure Test | 2/7/2011 | 2/8/2011 | 2/9/2011 | A | PART |
Dixie Fellows
|
|
|
this is a for the Geothermal. If questions please contact Terry @ ###-####. Phone #: ###-#### >> Inspection requested via web by Sonja Hankel....2--3" main for geothermal ok at 100lb test
|
MEC-Aging Inspection | 12/20/2010 | 12/20/2010 | 12/22/2010 | | PASS |
Dixie Fellows
|
|
|
wip
|
Rough-in | 10/15/2010 | 10/18/2010 | 10/18/2010 | A | PART |
Dixie Fellows
|
|
|
Please call Terry with questions ###-#### Phone #: ###-#### >> Inspection requested via web by Sonja Hankel...100lb test from sidewalk to right inside bldg ok..2 tests
|