Final | 12/6/2010 | 12/6/2010 | 12/6/2010 | P | PASS |
Dixie Fellows
|
|
|
please call Eric @ ###-#### with any questions. Phone #: ###-#### >> Inspection requested via web by Angie maguire
|
Final | 11/16/2010 | 11/22/2010 | 11/22/2010 | A | FAIL |
Dixie Fellows
|
|
|
call Eric @ ###-#### with any questions Phone #: ###-#### >> Inspection requested via web by Angie maguire...flue needs to extend to the edge of the deck with a 1/4" slope per foot back to furnace..wrap all pvc outside with armaflex..add another comb air as the old one is partially covered by the furnace..called eric
|