Final | 7/18/2011 | 7/18/2011 | 7/18/2011 | P | PASS |
Bill VanDegrift
|
|
|
will Phone #: ###-#### piping only final ok
|
Mec-Aging Inspection | 6/14/2011 | 6/14/2011 | 6/14/2011 | | PASS |
Dixie Fellows
|
|
|
wip...work moving slowly
|
Rough-in | 3/15/2011 | 3/16/2011 | 3/16/2011 | A | DONE |
Jim Johnson
|
|
|
will Phone #: ###-####
|
Rough-in | 2/9/2011 | 2/10/2011 | 2/10/2011 | A | PASS |
Bill VanDegrift
|
|
|
call for access//insp for hydronic piping//Will Phone #: ###-#### 1st floor hydronic piping 100# test ok
|
Rough-in | 1/26/2011 | 1/27/2011 | 1/27/2011 | A | PASS |
Bill VanDegrift
|
|
|
Will ###-####, call for access info 100# RADIANT FLOOR IN BASEMENT TEST OK
|
Rough-in | 1/20/2011 | 1/21/2011 | 1/21/2011 | A | PART |
Bill VanDegrift
|
|
|
hydronic piping//Will ###-#### line sets and condensate for future units ok
|