Final | 1/27/2011 | 1/28/2011 | 1/28/2011 | P | PASS |
Dixie Fellows
|
|
|
sign card...ncos...please sign card at city hall
|
Final | 1/27/2011 | 1/27/2011 | 1/27/2011 | P | NR |
Dixie Fellows
|
|
|
need to sign card....card will be on site fri am
|
Pressure Test | 1/26/2011 | 1/27/2011 | 1/27/2011 | A | PASS |
Dixie Fellows
|
|
|
meet kurt with int gas to talk about gas line...60lb gas ok...new gas line supported
|
Final | 1/25/2011 | 1/26/2011 | 1/26/2011 | A | FAIL |
Dixie Fellows
|
|
|
Contact Brian Means For Specific Directions To Jobsite & To Meet You At Front Gate. This Is A Request For Final Inspection On Natural Gas Line. RM Installed Tankless Water Heater, TML Installed Furnace. Phone #: ###-#### >> Inspection requested via web by Allison Briggs...gas line failed..condensates not completed...i'm meeting kurt with int gas thurs am to look at the gas line
|
Final | 1/24/2011 | 1/25/2011 | 1/25/2011 | P | NR |
Dixie Fellows
|
|
|
Contact Brian Means For Detailed Directions. Boise Zoo - Animal Hospital Project Phone #: ###-#### >> Inspection requested via web by Allison Briggs...need to add tankless w/h to permit...tml needs permit and inspection
|