Final | 5/6/2011 | 5/9/2011 | 5/9/2011 | A | PASS |
Dixie Fellows
|
|
|
Phone #: ###-#### >> Inspection requested via web by Dustin Rich
|
Final | 5/4/2011 | 5/5/2011 | 5/5/2011 | A | FAIL |
Dixie Fellows
|
|
|
The builder said the elect will be done Phone #: ###-#### >> Inspection requested via web by Dustin Rich...doors locked as they are doing the hardwood floors
|
Final | 5/4/2011 | 5/4/2011 | 5/4/2011 | A | NR |
Dixie Fellows
|
|
|
>> Inspection requested via web by Dustin Rich...need elec to be finished at equipment in crawl
|
Rough-in | 3/10/2011 | 3/11/2011 | 3/14/2011 | A | PASS |
Dixie Fellows
|
|
|
Phone #: ###-#### >> Inspection requested via web by Dustin Rich...r/i and gas ok
|
Rough-in | 3/10/2011 | 3/10/2011 | 3/10/2011 | P | PEND |
Dixie Fellows
|
|
|
>> Inspection requested via web by Dustin Rich...dustin will reschedule
|
Pressure Test | 3/10/2011 | 3/10/2011 | 3/10/2011 | P | NR |
Dixie Fellows
|
|
|
>> Inspection requested via web by Dustin Rich...unable to get up inside crawl to get to furn and gas test...called justin and he will reschedule
|